Accessory Dwelling Units (ADUs) β also called in-law suites, basement apartments, or backyard cottages β are booming across Utah. State law now requires most cities to allow ADUs on single-family lots.
Types of ADUs
- Attached ADU: Addition to main home
- Detached ADU: Separate structure (backyard cottage)
- Basement ADU: Separate entrance from existing basement
- Garage conversion: Convert attached or detached garage
Construction Costs
- Basement conversion: $40,000β$90,000
- Detached ADU (400β600 sqft): $120,000β$220,000
- Garage conversion: $50,000β$100,000
- Attached addition ADU: $150,000β$280,000
Zoning & Legal Requirements
Utah's ADU law (SB 82, updated 2023) requires cities to allow at least one ADU per single-family lot. However:
- Setback requirements still apply (typically 5 ft side/rear)
- Maximum size limits vary by city (usually 50% of main home or 1,000 sqft)
- Owner-occupancy may be required in some cities
- Separate utility connections may be required
Permit Process
Expect 4β12 weeks for ADU permit approval. Required documents:
- Site plan showing setbacks
- Floor plans and elevations
- Structural drawings (engineer-stamped)
- Utility connection plan