Back to Blog

ADU Construction in Utah: Rules, Costs, and Permits for 2026

ContractorLink Team May 1, 2026

ADU Construction in Utah: 2026 Guide

Accessory Dwelling Units (ADUs) β€” also called in-law suites, basement apartments, or backyard cottages β€” are booming across Utah. State law now requires most cities to allow ADUs on single-family lots.

Types of ADUs

  • Attached ADU: Addition to main home
  • Detached ADU: Separate structure (backyard cottage)
  • Basement ADU: Separate entrance from existing basement
  • Garage conversion: Convert attached or detached garage

Construction Costs

  • Basement conversion: $40,000–$90,000
  • Detached ADU (400–600 sqft): $120,000–$220,000
  • Garage conversion: $50,000–$100,000
  • Attached addition ADU: $150,000–$280,000

Zoning & Legal Requirements

Utah's ADU law (SB 82, updated 2023) requires cities to allow at least one ADU per single-family lot. However:

  • Setback requirements still apply (typically 5 ft side/rear)
  • Maximum size limits vary by city (usually 50% of main home or 1,000 sqft)
  • Owner-occupancy may be required in some cities
  • Separate utility connections may be required

Permit Process

Expect 4–12 weeks for ADU permit approval. Required documents:

  • Site plan showing setbacks
  • Floor plans and elevations
  • Structural drawings (engineer-stamped)
  • Utility connection plan

Peaking E&C (pec-ut.com) provides ADU engineering and permitting support across Utah.


Find ADU contractors in Utah for free on ContractorLink.

Ready to start your project?

Post your project for free and get matched with contractors serving your area.

Related Articles